In 2025, we began installing the Ckhuri wind farm consisting of 19 Vestas V150 turbines in Calama, Chile. This project was carried out for our client, Mainstream Renewable Power, with whom we have collaborated on numerous occasions. The installation was successfully completed in July 2025.

Features:

  • 2025

  • Calama (Chile)

  • Mainstream

  • Installation of 19 Vestas V150 turbines, each with a unit power of 4.2 MW.