In 2016, Tecnorenova installed five 2.1 MW Envision E110 turbines in the Bio Bio region. This project included transporting components and additional supplies. The Envision E110-2.1 has a rated power of approximately 2.10 MW. The wind turbine begins to operate at a wind speed of 3 m/s, and the cut-off wind speed is 20 m/s.

Features:

  • 2016

  • Chile
  • Envision
  • Installation of five 2.1 MW Envision E110 turbines