Tecnorenova installed 29 Goldwind GW 165 wind turbines with a capacity of 5.2 MW in the Antofagasta region. The company provided the installation labour and lifting equipment (main and auxiliary cranes).

The company contributed its regional and technological expertise once again, enabling optimal results in the project.

Features:

  • 2024

  • Región de Antofagasta (Chile)

  • Goldwind

  • Installation of 29 Goldwind GW 165 5.2 MW wind turbines.