In 2019, we supervised the assembly of 27 Senvion M114 3.6 MW wind turbines at the Los Hércules wind farm in Santa Cruz.
Supervision must be carried out by a company that is different from the one responsible for assembly. Our role as supervisors is to ensure that the assembly and installation processes are carried out in accordance with the manufacturer’s manuals and that safety is maintained during operations.










