In 2020, Tecnorenova installed 11 V136-3.45 MW wind turbines at the Negrete Wind Farm in the Biobío region.

Features:

  • 2020

  • Negrete (Chile)
  • Vestas

  • Installation of 11 V1363.45 wind turbines