In 2020, Tecnorenova assembled seven 3.6 MW AW3000 wind turbines at the San Francisco wind farm in Zaragoza, Spain.

Features:

  • Noviembre de 2020

  • Zaragoza, Spain

  • Nordex Acciona

  • Installation of seven 3.6 MW Acciona AW3000 wind turbines

Related works