In 2021, Tecnorenova dismantled the Serra da Lage wind farm, which was equipped with four 750 kW NEG Micon NM48 turbines.

This allowed the farm to be repowered with new, more modern wind turbines.

Features:

  • 2021

  • Serra da Lage (Portugal)

  • Dismantling of the Serra da Lage wind farm and subsequent repowering

Related works