In 2022, a generator change was carried out on a 1.5 MW Vensys VEN77 wind turbine generator (WTG) in Wales.
Retrofitting involves carrying out the necessary tasks to address issues related to the obsolescence of systems installed in wind turbines.
In 2022, a generator change was carried out on a 1.5 MW Vensys VEN77 wind turbine generator (WTG) in Wales.
Retrofitting involves carrying out the necessary tasks to address issues related to the obsolescence of systems installed in wind turbines.