In 2022, Tecnorenova installed 19 Nordex Accion N163 wind turbines, each with a capacity of 5.7 MW, at the Torsa wind farm. This brought the total capacity of the farm to 108.3 MW.
The Torsa wind farm is located in the Santiago Region and is Statkraft’s first development in Chile.





