In 2022, a generator change was carried out on a 1.5 MW Vensys VEN77 wind turbine generator (WTG) in Elliingstedt, Germany.
Although the team carrying out the repairs is small, they must be specialised in the specific repair to be performed in each case.
Our goal is to minimise downtime, as this has a direct impact on production.







