In 2022, a generator WTG Vensys VEN77 of 1.5 MW was replaced in Elliingstedt, Germany.
The team of professionals that performs these corrective measures is small and specialized so as to comply with the technical specifications of each task.
Our main goal is always to complete the task in the shortest amount of time, reducing significantly the time the turbine isn´t producing.