Los Cururos (Chile)

We carried out the assembly of 57 WTG Vestas V100 of 1.8 MW in the Commune of Ovalle, Chile. This project included the complete management of components shipping.

This project included the complete management of components shipping.

The V100-1.8 MW wind turbine begins to work at a wind speed as low as 3 m/s. The Vestas V100-1.8 is equipped with a spur/planetary gearbox which counts with 3 stages.