El Arrayán (Chile)

In 2013 and 2014, Tecnorenova assembled 50 2.3 MW Siemens wind turbines in the Commune of Ovalle, the largest wind farm in Chile. At a wind speed of 3 m/s, the wind turbine starts its works At a wind speed of 3 m/s, the wind turbine starts its work and the maximum speed of the rotor is about 16 U/min.